Reservoir Waterproofing – Barwa Utility Project Phase – 1

Scope of Works:

We were awarded for waterproofing for the very big reservoir in Doha using Sikaplan WT 4220-15C TPO membrane system and we have completed successfully within the time allowed. The surface area of waterproofing was 9,500 square meter.